Choose the language: PT | EN | ES

PROJECTS

Laser Scan

Aguas Teñidas Mine

Point cloud of the WDC – Water Distribution Centre, one of the essential components of the mining process.

 

Hydroelectric Power Station of Salamonde

Point cloud of the cave where the new Hydroelectric Power Station was built.

 

Marão Tunnel

Point cloud of the construction of the longest road tunnel of the Iberian Peninsula.

 
 

3D Modelling

Aguas Teñidas Mine

3D Modelling of a Clarifier, one of the most important pieces of equipment in the Industrial Mining Process.

 

Agua Blanca Mine

Modelling the access tunnels to the mineral lode.

 

Drilling equipment

Drilling machine used in the mining industry, public works, civil construction, hydraulic works, Geological and in Geotechnical studies.

 
 

Dimensional Control

Flotation Cells

The purpose of this study was to determine, assess and validate deformations in the construction of 5, 10 and 50 cubic-meter floating cells.

 

Hydraulic component

The roundness, flatness and centrality of the component has been evaluated for the Dimensional Control of the Draft Tube.

 

Ball Mill

Support, verification and validation of the assembly of a Ball Mill and all its components.

 
 

Scanning and Modelling

Ballast

This work was conducted as part of the study of a ballasted railway, in partnership with the Department of Transportation of LNEC (National Laboratory for Civil Engineering) and the Faculty of Engineering of the University of Porto.

 

Lock

For safety reasons and in order to reproduce the prototype and the technical drawings of the lock, the original lock was scanned and modelled.

 

Valve

A hydraulic valve was scanned, modelled, and reverse-engineered in order to obtain its technical drawings.